U bent nu hier: Wettenbank
Zoals vergunningen, bouwplannen en lokale regelgeving
Zoals belastingen, uitkeringen en subsidies.
Officiële publicaties van de overheid.
Adressen en contactpersonen van overheidsorganisaties.
U bent hier:
[Regeling vervallen per 31-12-2021.][Regeling treedt (deels) in werking per 20-02-2013.]Geraadpleegd op 27-03-2026. Gebruikte datum 'geldig op' en zichtdatum . Geldend van 12-10-2020 t/m 30-12-2021.
Administratief Akkoord tussen het Koninkrijk der Nederlanden en de Volksrepubliek Bangladesh inzake het project "Blue Gold"
[Regeling vervallen per 31-12-2021]
The Minister for Foreign Trade and Development Cooperation of the Kingdom of the Netherlands, being the competent Netherlands Authority for the purpose of this Administrative Arrangement, hereinafter referred to as “the Netherlands Party”, represented in this matter by the Ambassador of the Kingdom of the Netherlands in Dhaka, Bangladesh
and
The Economic Relations Division of the Ministry of Finance of the People’s Republic of Bangladesh, being the competent Bangladesh Authority for the purpose of this Administrative Arrangement, hereinafter referred to as “the Bangladesh Party”,
Having regard to the provisions of Article I of the Agreement on Technical Co-operation between the Kingdom of the Netherlands and the People’s Republic of Bangladesh signed at Dhaka on 19 May 1977, hereinafter referred to as “the Agreement”,
Have entered into the following Administrative Arrangement:
1 The two Parties shall jointly carry out a program, entitled “Blue Gold”, hereinafter referred to as “the Program”;
2 The aim of the Program is to reduce poverty in the coastal area by enhancing the livelihood of the rural population, through more efficient water resources management and increased productivity of mainly crops, fishery and livestock in the polders and by empowering the communities to become the driving force for the development activities. It also aims to improve people’s adaptation capacity to climate change impacts;
3 The aforesaid co-operation between the two Parties is planned to last from 20 February 2013 to 31 December 2021.
The Netherlands Party shall make a maximum contribution of € 61,915,000 to the Programme in the following manner:
– a maximum of € 27,320,000 of grant financing to be administered by the Bangladesh Water Development Board (BWDB);
– a maximum of € 1,495,000 of grant financing to be administered by the Department of Agricultural Extension (DAE);
– a maximum of € 33,100,000 for Technical Assistance, through direct contracting by the Netherlands Party including support to the activities related to Department of Fisheries and Department of Livestock Services.
The Netherlands Party’s contribution will become available on the condition that:
– The Bangladesh party shall have approved the consolidated revised Development Project Proforma (RDPP) for the entire Programme no later than 28 February 2017;
– BWDB shall have deployed sufficient staff for Programme Management Office (PMO) and Design Offices in Dhaka and field offices;
– DAE shall have deployed sufficient staff for Dhaka and field offices for implementation of DAE Component works.
The Bangladesh Party shall make at least Bangladesh Taka 1,315,200,000 available to the Programme.
1 The Netherlands Party shall appoint the Embassy of the Kingdom of the Netherlands as the Netherlands Executive Authority in charge of the Program. The Netherlands Executive Authority shall be represented, as far as the daily operations of the Program are concerned, by the Leader of the Technical Assistance Team (being the Team Leader or in his absence the Deputy Team Leader, hereinafter referred to as “TL/DTL”);
2 The Bangladesh Party shall appoint the Ministry of Water Resources as the Bangladesh Executive Authority in charge of the Program. The Bangladesh Executive Authority shall be represented, in as far as the daily operations of the Program are concerned, by the Program Coordinating Director.
Each of the Executive Authorities shall be entitled to delegate under its own responsibility, partly or entirely, its duties in connection with the Program to other authorities or organisations. In doing so, the Executive Authorities shall inform each other in writing of any such delegation and of the extent of the delegation.
1 The TL/DTL shall be responsible to the Netherlands Executive Authority for the correct implementation of the Netherlands contribution;
2 The TL/DTL shall act in close consultation with the Bangladesh Executive Authority and shall respect the operational instructions given by the said Authority to the Bangladesh personnel;
3 The Bangladesh Executive Authority shall provide the TL/DTL with any information that may be considered necessary for the execution of the Program.
1 The Executive Authorities shall establish in common agreement a Schedule of Operations indicating in detail:
– the contribution of either Party;
– the number and duties of the staff appointed by each Party;
– their job-descriptions;
– the duration of their assignment;
– a time-table;
– a description of the equipment and materials to be made available.
2 The Schedule of Operations shall form an integral part of this Administrative Arrangement.
3 The Schedule of Operations may be amended in common agreement by the Executive Authorities.
The personnel supplied by the Netherlands Party shall enjoy the privileges and immunities, mentioned in the Articles II and III of the Agreement.
1 The provisions of Article IV and V of the Agreement shall be applicable to the import and export of the equipment and materials provided by the Netherlands Party as well as to the status of the said equipment and materials.
2 Without prejudice to the payment by the Bangladesh Party or the Bangladesh recipient agency of the customs duties and taxes on the equipment and materials supplied by the Netherlands Party, those custom duties and taxes are due upon the transfer of the equipment and materials to the Bangladesh Party or Bangladesh recipient agency. The Netherlands Party is in no way under an obligation to pay the customs duties or taxes.
The TL/DTL and the Program Coordinating Director shall submit to both Executive Authorities an annual report in English. The first annual report on the progress made in the execution of the Program and on the expenditure incurred by both Parties will cover the period from start till 30 June 2013; subsequent annual reports will follow the Bangladesh Fiscal Year, i.e. cover the period from 1 July till 30 June the next year. The information on the TA budget expenditure will be shared with the Bangladesh Party. Approval or rejection of expenditures made from the Netherlands contribution is entirely and solely at the discretion of the Netherlands Executive Authority. On termination of the Program, the TL/DTL and the Program Coordination Director shall submit to all parties involved a final report in English on all aspects of the work done in connection with the Program.
The Executive Authorities shall have the Program evaluated through two joint Mid-Term Review mission; the timing and the ToR of this missions will be determined by both Executive Authorities.
Any dispute concerning the interpretation or implementation of this Administrative Arrangement, which cannot be settled in consultation between both Parties shall be referred to the respective Governments and shall be settled in a way to be decided upon by the latter.
This Administrative Arrangement shall enter into force on the day of signature by both Parties and shall expire at the end of the period mentioned in Article I, paragraph 3, of this Arrangement or on the date on which the Program has been completed in conformity with the provisions of this Arrangement and of the Program Document, whichever date is the later.
DONE at Dhaka in two originals in the English language both texts being equally authentic.
For and on behalf of the Minister for Foreign Trade and Development Cooperation of the Kingdom of the Netherlands
C.J.J. RICHTER
Chargé d’Affaires a.i.
Embassy of the Kingdom of the Netherlands
Dhaka
Dated: 20 - FEB - 2013
For and on behalf of the Government of the People’s Republic of Bangladesh, the Economic Relations Division of the Ministry of Finance
ABUL MANSUR MD. FAIZULLAH
Joint Secretary ERD
Ministry of Finance
Dated: 20/2/2013
Voor een permanente link naar de door u bekeken versie, inwerkinggetreden op , kopieer één van de onderstaande links of verfijn de link in de Linktool.
Met behulp van de Linktool van LiDO is het mogelijk om een bredere link of een meer gedetailleerde link te maken.
Ga naar de Linktool
Op linkeddata.overheid.nl zijn onderstaande relaties bekend.
Er is geen andere versie beschikbaar waarmee u de huidige geselecteerde versie, inwerkinggetreden op , kan vergelijken.
Selecteer een andere versie van de regeling waarmee u de huidige versie , inwerkinggetreden op , wilt vergelijken.
Vergelijken van "Administratief Akkoord tussen het Koninkrijk der Nederlanden en de Volksrepubliek Bangladesh inzake het project "Blue Gold"", inwerkinggetreden op , met versie die inwerking is getreden op .
Doordat er een grote regeling is gekozen kan de vergelijking enkele minuten duren.
U kunt kiezen voor het toevoegen van de wetstechnische informatie aan de tekst.
U kunt kiezen in welk formaat de tekst geëxporteerd wordt.
U kunt de tekst inclusief afbeeldingen exporteren. De afbeeldingen worden dan met de tekst in een .zip-bestand geleverd
Via deze link kunt u meer informatie krijgen over de Europese richtlijn of verordening waarnaar in de tekst van de regeling verwezen wordt, inclusief de tekst daarvan. U wordt hiervoor doorgeleid naar EUR-LEX, de online databank van de Europese Unie waarin de Europese wetgeving is opgenomen.